Once the temporary track was completed to reach the four axles of this loco, the loco was lowered slowly on to the freshly laid track. The skill and expertise of the crane operator is paramount here, who has to give the right amount of swing to align the loco to the track and then lower it gently on to the track.

Date: 2004-11-09
Owner: Gallery Administrator
Size:
Full size: 604x801