WDG-3a triplet + dual WDG-3a now head the Iron Ore rake down the ghats. Note that the dual WDG-3a in the back will idle all the way back down. Only the triplets in the front are live. The dual WDG-3a are attached to the iron ore rake to save a path. After the train reaches Subramania, the dual WDG-3a will bank the only passenger train on this section, the MAQ-SBC express.

Date: 2008-01-14
Owner: Jay Balakrishna
Size:
Full size: 1280x771