Calicut Trip-Upper quadrant semaphore signaling in place at Calicut Station. These won't be there for too long as doubling work along with route relay interlocking with color aspect signaling in being installed slowly and in patches between Calicut-Shornur Junction. Calicut, 25 August 2005. Sandeep Mohan.

Date: 2006-09-25
Owner: Sandeep Mohan
Size:
Full size: 1024x768