Latest Comments

Page 1 of 2
train1d
Vivek Pillay(The old man)
Posted by Lalam on 2009 Mar 23 15:59:19 +0000
train1e
What a location Sachinbhai has chosen!!
Posted by Karan Desai on 2009 Mar 21 14:57:14 +0000
A day at the Dhulghat Spiral
Great job done by all of you. Keep it up.
Posted by Arzan Kotval on 2009 Mar 20 15:58:09 +0000
train1d
great...who' that taking the photo?
Posted by Milind on 2009 Mar 20 11:19:47 +0000
train1c
Super indeed. Anyone hanging out can fall straight down....
Posted by Milind on 2009 Mar 20 11:18:14 +0000
A day at the Dhulghat Spiral
Good work, a very nice collection of pictures...
Clarity of pictures is amazing. Cheers!
Posted by Krupa Ratnam on 2009 Mar 19 07:34:40 +0000
markings
CCN - Cement Concrete (The type of foundation)
RL-BF - Height from Rail Level to Bottom of Foundation
RL-TF - Height from Rail Level to Top of Foundation (Both of these should have been etched on the concrete but are not)
M,R - The strata on which the foundation is built. In this case its Murum and Rock. (Usually a number is inscribed with each of these indicating that while digging we passed through x ft of Murum and now resting on rock. But no numbers have been inscribed for the Murum here). Nitin Shukla
Posted by Gallery Administrator on 2009 Mar 18 14:08:35 +0000
evening pass
Magnificent! Hard to imagine that I actually went over this bridge last December (on the MG pass) - it was all over too soon :-(
Posted by Mani Vijay on 2009 Mar 17 16:34:54 +0000
A day at the Dhulghat Spiral
Enjoyed the virtual trip on Dudhlaghat....many thanks.

Posted by Milind on 2009 Mar 16 03:10:46 -0400 (220.224.109.202)
Posted by Gallery Administrator on 2009 Mar 16 11:11:18 +0000
train2b
Is the train fully equipped with 'air brake' system or just the first coach?
Posted by Krupa Ratnam on 2009 Mar 16 03:49:35 +0000