Login
Gallery Accidents and Derailments A Disaster Recovery Operation photo22.gif

After the four axles of the loco were lowered on to the newly laid set of tracks, the crane was pushed further by the WDM-2 until the crane was able to couple to the WDG-2. Now, the brute force of the WDM-2 was used to forcibly drag the crippled WDG-2 on to the tracks and beyond to the loop line. The WDM-2 was powered up to Notch-5 in gradual steps without any movement at all. The re-railment of the WDG-2 needed notch 6 power in the WDM-2. With this action, the recovery of one WDG-2 was complete.

Date: 2004-11-08
Owner: Gallery Administrator
Size:
Full size: 782x579

nextlast
first previous
photo22.gif








nextlast
first previous
© 2004-2008, IRFCA and individual image owners. All rights reserved. Contact webmaster@irfca.org for permission to re-use.
Submission Guidelines   Legal information and Disclaimers   Search Site   Support this site!
Note: This site is not officially affiliated with Indian Railways! The official web site of Indian Railways is: http://www.indianrailways.gov.in