The first “Ghat” 1: The so called “ghat” section on the MUE-ADB stretch consists of 2 stretches- The first one of 15 kms is between Dhanora Deccan to Bodhani Bujrug. I was ready with a note pad for counting the number of tunnels on special demand of VSP! However, I was quite disappointed as there is not a single tunnel in either of the sections. Dr Akash Bang
Date: 2007-04-02
Full size:
1024x768
Photo Properties
Summary Details
| Make | SONY | Model | DSC-W7 |
| Aperture Value | f/5.6 | Color Space | Uncalibrated |
| Exposure Bias Value | 0 EV | Exposure Program | Program |
| Flash | No Flash | Focal Length | 7.9 mm |
| ISO | 100 | Metering Mode | Multi-Segment |
| Shutter Speed Value | 1/400 sec | Date/Time | 2007 Apr 02 08:33:33 +0000 |