|
Here's a clip showing the whistling of the fairy queen. Unfortunately I could not find a place on the engine's footplate and had to be content shooting through the glass of the coach. The angle does not make a great viewing, but here it is!
Date: 2006-03-19
Owner: Rajeev Shrivastava
Views: 450
|
Fairy Queen in Perambur Loco Works undergoing last minute repairs before being steamed. 2007-09-04 Perambur Ranganath Eunny
Date: 2007-09-17
Owner: Guest
Views: 326
|
The air brake set up made on the Fairy Queen. A compressor and a Shriram Honda generator set to power it. 2007-09-04 Perambur Ranganath Eunny
Date: 2007-09-17
Owner: Guest
Views: 241
|
|
The little brass thing is the whistle! 2007-09-04 Perambur Ranganath Eunny
Date: 2007-09-17
Owner: Guest
Views: 208
|
Big Wheel. 2007-09-04 Perambur Ranganath Eunny
Date: 2007-09-17
Owner: Guest
Views: 237
|
The Fairy Queen all set to run down the test track within the Perambur Loco Works. PLW 2007-09-04 Ranganath Eunny
Date: 2007-10-01
Owner: Guest
Views: 311
|
|
Up Close and Personal with the steaming lady. 2007-09-04 Ranganath Eunny
Date: 2007-10-01
Owner: Guest
Views: 233
|
Visual Quiz: Identify an IRFCA member getting a free ride on the Queen's footplate. 2007-09-04 Ranganath Eunny
Date: 2007-09-05
Owner: Guest
Views: 320
|
The Fairy Queen hurtling down the test track at PLW. 2007-09-04 Ranganath Eunny
Date: 2007-10-01
Owner: Guest
Views: 251
|
|
Gowrishankar just can't get enough of the Fairy Queen. Perambur 2007-09-04 Ranganath Eunny
Date: 2007-09-05
Owner: Guest
Views: 248
|
On September 6, the Fairy Queen is all set to pose for the press and steam again, this time with a load. Perambur 2007-09-06 Ranganath Eunny
Date: 2007-09-07
Owner: Guest
Views: 254
|
Clouded in its own steam. Perambur 2007-09-06 Ranganath Eunny
Date: 2007-09-07
Owner: Guest
Views: 213
|
|
The press corps have left with pictures and reports but the Queen is still has one more job left - to steam again with a load. Perambur 2007-09-06 Ranganath Eunny
Date: 2007-10-01
Owner: Guest
Views: 271
|
The Fairy Queen is ready for the trial run with load. the load is a single second seating car. Behind the car is a WDS4 shunter that will push the formation out of PLW premises. Perambur 2007-09-06 Ranganath Eunny
Date: 2007-10-01
Owner: Guest
Views: 293
|
The Fairy Queen awaits the pointsman to switch the tracks so that it may go over ther mainline at Villivakam. 2007-09-06 Ranganath Eunny
Date: 2007-10-01
Owner: Guest
Views: 299
|
|
WCBRRM coach for Fairy Queen. See the huge windows for the rear cabin, which seats 8 comfortably.
Date: 2006-03-18
Owner: Rajeev Shrivastava
Views: 590
|
Technical details of Fairy Queen on a plate fixed on the engine.
Date: 2006-03-18
Owner: Rajeev Shrivastava
Views: 426
|
Details of resurrection and POH of Fairy Queen
Date: 2006-03-18
Owner: Rajeev Shrivastava
Views: 347
|
|
The coal is not in a tender but stacked in a cage in the rear of the engine's body.
Date: 2006-03-18
Owner: Rajeev Shrivastava
Views: 366
|
The Fairy Queen gets ready at Delhi Cantt.
Date: 2006-03-18
Owner: Rajeev Shrivastava
Views: 447
|
Fairy Queen building up steam
Date: 2006-03-18
Owner: Rajeev Shrivastava
Views: 434
|
|
Front view of Fairy Queen.
Date: 2006-03-18
Owner: Rajeev Shrivastava
Views: 414
|
The rear cabin in the Fairy Queen Express coach. It has huge windows.
Date: 2006-03-18
Owner: Rajeev Shrivastava
Views: 474
|
The seating arrangement in rear cabin in fairy queen express coach
Date: 2006-03-18
Owner: Rajeev Shrivastava
Views: 410
|
|
The crew readies for the departure of fairy queen
Date: 2006-03-18
Owner: Rajeev Shrivastava
Views: 338
|
The connection for pressurized air for the brakes. The compressor is in the rear coach and air is piped to the engine.
Date: 2006-03-18
Owner: Rajeev Shrivastava
Views: 310
|
The engine has been retrofitted with a petrol driven compressor for the air brakes but this is not used. The air is piped from the compressor housed in rear coach
Date: 2006-03-18
Owner: Rajeev Shrivastava
Views: 329
|