The pulley system attaches to the box on the top and upon tracing where all the links were going it was leading to the Air Brake pipes. Bangalore, 13 Feb 2004. By Anil Tharian.

Date: 2004-02-13
Owner: Gallery Administrator
Full size: 640x480
Trains012.jpg