History of Electrification

Material here is taken from tables published by CORE in various reports and on their web site. CORE is gratefully acknowledged for compiling this material and making it available in the public domain.

Also see the FAQ sections on electric traction.

IR Electrification Chronology up to 31.03.2004

Note: 'Charged to 2.2kV' means that when there was a long period of time between installation of the catenary and other structures and the actual start of electrified services on the section, the catenary was kept energized at a voltage of 2.2kV to deter thieves looking to steal the catenary cables.

Financial Year Section Zonal Rly RKM TKM Date of Energization CRS Inspection Remarks
1925 Bombay VT - Kurla & Mahim Chord (Harbour Br.) CR 16   1.2.25   1500V DC
1930 Bombay-Poona, Kalyan-Igatpuri CR 276   1.1.30   1500V DC
1936 Kurla-Mankhurd CR 7   1.1.36   1500V DC
1967-68 Igatpuri-Ghoti CR 6 14 5.3.68    
1967-68 Ghoti-Asvali CR 18 38 6.3.68    
1967-68 Asvali-Devlali CR 16 35 7.3.68    
1967-68 Devlali-Nasik Road CR 11 36 10.3.68    
1968-69 Igatpuri Yard CR 4 12 2.4.68    
1968-69 Nashik Raod - Niphad CR 29 68 16.4.68    
1968-69 Niphad-Manmad CR 42 95 21.5.68    
1968-69 Manmad-Nandgaon CR 23 65 30.5.68    
1968-69 AC/DC change-over at Igatpuri CR   7 22.1.69    
1968-69 Nandgaon-Naydongri CR 20 43 13.11.68    
1968-69 Naydongri-Chalishgaon CR 18 38 25.11.68    
1968-69 Chalisgaon-Vaghli CR 13 33 19.12.68    
1968-69 Bhusaval FP CR 3 10 8.1.69    
1968-69 Bhusaval MOH Shed / Vaghli SSP CR 13 29 15.1.69    
1968-69 Kajgaon-Pachora CR 24 56 29.1.69    
1968-69 Pachora-Shirsoli CR 36 80 17.2.69    
1968-69 Shirsoli Km 442 CR 31 67 11/14.3.69    
1968-69 Bhusaval Up & Down yard CR 3 23 26.3.69    
1968-69 Bhusaval Passenger Loco Shed. CR 1 2 31.3.69    
1974-75 Trombay-Kurla CR   20     1500V DC
1975-76 Trombay-Kurla CR 5 12      
1982-83 Faridabad-Ballabhgarh CR 14 89 31.3.83    
1982-83 Diva-Basai Road* CR 42 45  -   1500V DC
1983-84 Ballabhgarh-Palval CR 21 70 16.8.83    
1983-84 Palval-Kosikalan CR 45 90 8.2.84    
1983-84 Kosikalan-Mathura-Bad CR 49 156 30.3.84    
1984-85 Bad -Rajakimandi CR 44 90 27.4.84    
1984-85 Raja-ki-mandi - Agra CR     24.5.84    
1984-85 Agra-Dhoulpur CR 47 100 30.3.85    
1985-86 Dhoulpur-Gwalior CR 69 180 31.10.85    
1986-87 Gwalior-Dabra CR 40 91 26.12.86    
1986-87 Dabra-Jhansi (outer) CR 54 118 1.3.87    
1986-87 Jhansi (outer) -Jhansi yard CR 7 62 11.3.87    
1986-87 Jhansi-Babina CR 22 59 30.3.87    
1987-88 Babina-Basai CR 12 28 19.6.87    
1987-88 Basai-Jiron CR 62 131 19.10.87    
1987-88 Jiron-Jakhlaun CR 10 26 14.1.88    
1987-88 Jakhlaun-Agasod CR 32 76 21.1.88    
1987-88 Agasod-Bina CR 8 22 21.3.88    
1987-88 Bina-Kurwai Ketora-Bareth CR 36 118 30.3.88    
1988-89 Bhophal-Habibganj CR 4 8 13.2.89    
1988-89 Habibganj-Misrod CR 6 14 15.2.89    
1988-89 Misrod-Barkhera CR 31 75 17.2.89    
1988-89 Barkhera-Itarsi CR 46 117 29.3.89    
1988-89 Ballarshah-Wardha-Nagpur CR 212 440 30.3.89    
1988-89 Bhusawal yard CR   3 1.12.88    
1988-89 Bhusawal-Bodwad CR 33 69 20.1.89    
1988-89 Bodwad-Nandura CR 42 89 30.3.89    
1988-89 Bareth-Gulabganj CR 32 78 7.10.88    
1988-89 Gulabganj-Bhopal CR 75 199 29.12.88    
1989-90 Nandura-Shegaon CR 28 68 27.7.89    
1989-90 Shegaon-Akola CR 33 70 7.12.89    
1989-90 Akola-Badnera CR 79 167 28.3.90    
1989-90 Itarsi yard (Bhusawal-Itarsi line) CR 10 41 7.1.90    
1990-91 Nagpur-Amla CR 167 324 3.15.91    
1990-91 Amla-Itarsi CR 130 249 3.28.91    
1990-91 Itarsi- Harda CR 66 146 3.31.91    
1990-91 Badnera Station CR 5 21 7.29.90    
1990-91 Badnera - Malkhed CR 14 28 12.28.90    
1990-91 Malkhed-Dhamangaon CR 29 73 1.17.91    
1990-91 Dhamnagaon-Wardha CR 51 121 3.31.91    
1990-91 Wardha yard (Down line) CR 0 75 10.31.90    
1990-91 Wardha yard (Up line) CR 0 10 11.30.90    
1991-92 Bhusawal-Burhanpur CR 47 111 10.17.91    
1991-92 Burhanpur-Nepanagar CR 28 62 1.8.92    
1991-92 Khandwa Yard CR 5 30 1.21.92    
1991-92 Nepanagar-Khandwa CR 55 122 1.31.91    
1991-92 Harda-Piplani CR 41 95 9.8.91    
1991-92 Piplani-Siora CR 19 41 10.17.91    
1991-92 Siora-Khandwa CR 40 87 11.7.91    
1991-92 Diva-Panvel CR 24 32 12.31.91    
1992-93 Bina-Girwar CR 97 228 3.31.93    
1992-93 Damoh-Sagoni CR 41 98 3.31.93    
1992-93 Kalapahar-Taku CR   13 3.31.93    
1993-94 Girwar - Damoh CR 54 117 3.31.94 17.5.96  
1993-94 Agasod-Karod-Malkheri CR 7 7 3.5.94    
1993-94 Badnera-Amravati CR 9 13 3.30.94    
1993-94 Sagoni-Katni Murwara CR 66 169 3.31.94    
1994-95 Katni Murwara-New Katni CR 10   Jan. 95 17.05.96  
1994-95 Tadali-Ghugus CR 14 19 Apr. 94    
1994-95 Jalamb-Khamgaon CR 12 15 Aug. 94    
1994-95 Butibori-Umrer CR 32 38 Nov. 94    
1994-95 Majri-Rajpur CR 21 29 Mar. 94    
2003-04 Jahanabad-Nadwan ECR 20 26 07.05.03 26/27.05.03  
2003-04 Nadwan-Patna ECR 29 47 21.05.03 26/27.05.03  
1957-58 Howrah-Sheoraphuli-Tarkeshwar ER 142 407 1957-1958   Converted to 25 KV AC in '65-'66 & '67-'68
1960-61 Kumardhubi-Dhanbad, Pradhankhunta-Pathatdih ER 55   21.11.60    
1960-61 Sitarampur-Kumardhubi ER 11 238 10.8.60    
1960-61 Waria-Asansol ER 34 154 31.3.61    
1960-61 Asansol-Sitarampur (including Borachuk-Hirpur Exchange Yard) ER 11   29.8.60    
1960-61 Dhanbad-Gomoh ER 30 79 01.2.61    
1961-62 Koderma-Gujhandi ER 10 24 31.8.61    
1961-62 Gujhandi-Gaya ER 69 175 13.11.61    
1961-62 Dhanbad-Kusunda-Tetulmari ER 10 18 10.1.62    
1961-62 Damodar-Kalipahari ER 4 4 8.6.61    
1961-62 Gomoh-Koderma ER 95 202 21.8.61    
1962-63 Andal, asansol, Durgapur Yard ER   13 1962    
1962-63 Gaya-Son Nagar ER 76 472 30.6.62    
1962-63 Son Nagar-Chandauli Majhwar ER 108   7.7.62    
1962-63 Chandauli Majhwar- Mughalsarai ER 19   25.7.62    
1963-64 Sealdah-Titagarh ER 20 264 21.10.63    
1963-64 Titagarh-Kalyani ER 28   22.10.63    
1963-64 Kalyani-Ranaghat ER 26   23.10.63    
1963-64 Narkeldangashed, Ranaghat yard ER          
1963-64 Dum Dum-Barasat ER 15 23 8.1.64    
1963-64 Ashoknagar-Bangaon ER 35 44 31.1.64    
1963-64 Barasat-Ashoknagar ER 19 21 1.2.64    
1963-64 Kancharapara workshop ER   3 19+F464    
1963-64 Mughalsarai Yard ER   41 22.10.63    
1963-64 Ranaghat-Shantipur ER 20 21 23.3.64    
1964-65 Narkeldanga Shed ER   1 27.7.64    
1964-65 Burdwan-Galsi ER 21 87 29.3.65    
1964-65 Galsi-Mankar ER 16 68 31.3.65    
1964-65 Dum Dum-Dankuni ER 16 39 14.2.65    
1964-65 Dankuni-Belanagar ER 4 10 2.3.65    
1964-65 Dankuni-Kamarkundu ER 18 37 19.3.65    
1964-65 Kamarkundu-Belmuri ER 15 36 30.3.65    
1964-65 Mughalsarai Yard ER   8 5.4.64    
1964-65 Mughalsarai Yard ER 5 12 25.3.65    
1964-65 Kalinarayanpur-KrishnanagarCity ER 22 27 16.4.64    
1965-66 Sealdah-Baruipur ER 26 67 12.65    
1965-66 Calcutta Goods yard ER   8 15.1.65    
1965-66 Kakurgachi-Ballygunge ER 9 20 16.2.66    
1965-66 Ballygunge-Docks ER 4 18 28.2.66    
1965-66 Ballygunge-Kalighat ER   4 1.3.66    
1965-66 Calcutta Docks-Phase II ER   12 21.3.66    
1965-66 Baruipur-Hotar ER 7 9 31.3.66    
1965-66 Mankar-Waria ER 35 145 20.5.65    
1965-66 Andal-Waria, Up/Dn slowlines & Yards ER   36 15.6.65    
1965-66 Durgapur yard ER   3 8.8.65    
1965-66 Andal Empties yard ER   6 28.9.65    
1965-66 Belmuri-Jaugram ER 19 41 27.4.65    
1965-66 Jaugram-Saktigarh ER 18 37 4.5.65    
1965-66 Dum Dum-Chitpur Yard ER 3 14 9.6.65    
1965-66 Mughalsarai Yard ER   3 13.6.65    
1965-66 Pathardig FP - Pathardih- Washery ER 2 9 14.9.65    
1965-66 Bandel -Naihati ER 8 15 14.6.65    
1965-66 Naihati Yard ER   20 23.7.65    
1965-66 Bandel yard ER   7 27.7.65    
1965-66 Naihati Goods Yard ER   10 27.9.65    
1966-67 Hotar-Deula ER 17 18 11.2/12.6.66    
1966-67 Deola-Diamond Harbour ER 10 11 5.5.66    
1966-67 Baruipur - Jaynagar Mazilpur ER 24 26 1/22.6.66    
1966-67 Jainagar Mazilpur-Lakshmokantpur ER 13 14 11.7.66    
1966-67 Sonarpur-Champahati ER 8 9 11.8.66    
1966-67 Champahati-Ghutiari Sharif ER 7 7 23.8.66    
1966-67 Ghutiari Sharif-Canning ER 14 16 3.9.66    
1966-67 Majerhati-Santoshpur ER 7 12 22.10.66    
1966-67 Santoshpur-Dudge Budge ER 8 14 11.11.66    
1968-69 Liluah Avoiding Lines ER   7 23.7.68    
1968-69 Tikiapara Yard ER   2 29.7.68    
1968-69 Engine Line at Howrah ER   3 3.8.68    
1968-69 Howra Goods Yard ER   9 28.8.68    
1968-69 Addition * ER 9 101  -   *Done by Rly
1970-71 Addition * ER 7 25  -    
1975-76 ?? ER   8      
1976-77 ?? ER   8 1.3.77   *Done by Rly, May '76 to Mar. '77
1977-78 Sealdah Down link ACCL * ER 4 10 10.5.77   *Done by Rly
1978-79 ?? ER   1 1.3.79   *Done by Rly, 9.78 to 3.79
1979-80 Kalyani- Kalyani Sinanta ER 5 15 1.9.79   *Done by Rly, Apr. '79 to Sep. '79
1980-81 Departmental ER   9 Mar. 81    
1986-87 Gomoh-Chandrapura including Up yard line Nos. 7 to 10 ER 17 46 25.9.86    
1986-87 Chandrapura-Rajabera ER 4 4 18.10.86    
1986-87 Rajabera-Bhandaridah ER 1 1 1987    
1986-87 Bhandaridah-Chandrapura ER 2 2 1987    
1988-89 Chandrapura-Phusro & Rajabera-Bhandaridah ER 15 24 25.12.88    
1992-93 Sonnagar-Baghabishnupur ER 6 44 3.31.93    
1992-93 Kajri-Kechki (exclusive of stations at either end) ER 23 42 3.31.93    
1992-93 Barkosalaiya-Kajratnawadih ER 15   3.31.93    
1993-94 Baghabisnupur-Baraki-Salaiya ER 15   1.30.94    
1993-94 Kajratnawadih-Japla ER 10   3.31.94    
1993-94 Garwa Raod - Kajri ER 26   2.5.94    
1993-94 Kecheki-Barwadih ER 18   3.21.94    
1993-94 Sonnagar Yard ER          
1994-95 Japla-Satbahini ER 24 55 Mar. 95    
1994-95 Satbahini station ER 3 9 Mar. 95    
1994-95 Untari Raod-Karkatta ER 6 14 Mar. 95    
1994-95 Karkatta-Garwa Road ER 8 20 Mar. 95    
1994-95 Barwadih-Tori ER 73 163 Mar. 95 06.09.96  
1994-95 Sitarampur-Chitranjan ER 18   Mar. 95    
1994-95 Bandel-Datrigram ER 52   Mar. 95    
1994-95 Kulpi-Karanjali ER 4   1995    
1995-96 Satbahini-Untari Road ER 4   31.3.96    
1995-96 Chitranjan-Jamtara ER 16 31 31.3.96 27.6.97  
1995-96 Dhatrigram-Katwa ER 53   31.3.96    
1995-96 Karanjali-Nishchintapur ER 8   31.3.96    
1996-97 Tori-Patratu ER 65 188 Feb. 97 06.09.96 up to Ray & 12.5.97 upto Barkakana  
1996-97 Jamtara-Madhupur ER 42 94 Jan. 97 27.6.97  
1996-97 Madhupur-Jaisidih/ Baidhyanathdham ER 35 78 31.03.97 26.9.97 Charged at 2.2 KV.
1996-97 Patratu-Barkakana ER 20 37 Feb'97    
1996-97 Barkakana-Danea ER 34 47 31.03.97 19.11.98 Charged at 2.2 KV.
1997-98 Gumia-Jarandih ER 11   Mar. 98    
1997-98 Jaisidih- Narganjo ER 36   Mar. 98 Nov'98  
1997-98 Dania-Gumia ER 18   Dec. 97    
1997-98 Jhajha-Kiul ER 56   Mar. 98   Charged at 2.2 KV
1998-99 Jarandih-Phusro ER 9   Mar. 99    
1998-99 Narganjo-Jhajha ER 8   Sep. 98 Nov'98  
1998-99 Mokama-Fatuha ER 68   Mar. 99 14.09.00 Charged at 2.2 KV.
1998-99 Mughalsarai-Kuchman ER 7   Mar. 99 30/31.1.02  
1999-00 Kiul-Mankatha ER 4   21.9.99 14.09.00  
1999-00 Mokama-Barhaiya ER 18   Mar. 00 14.09.00 Charged at 2.2 KV.
1999-00 Fatuha-Danapur ER 32   Mar. 00 14.09.00  
1999-00 Kuchman-Sakaldiha ER 9   18.12.99 30/31.1.02  
1999-00 Sakaldiha-Dildarnagar ER 40   Mar. 00 30/31.1.02 Charged at 2.2 KV.
2000-01 Manktha-Barhaiya ER 12 28 01.7.2000 14.09.00 Goods start 15.9.00
2001-02 Rampur Dumra-Hatidah Link & Tal - Hatidah ER 7 7 11.09.01 04.04.02 Goods start 21.10.01
2001-02 Hatidah-Garhara ER 11 50 15.10.01 04.04.02 Goods start 21.10.01
2001-02 Garhara-Barauni ER 3 20 26.3.02 04.04.02 Loco trial on 03.4.02
2001-02 DNR (excl.)-Bihta (incl.) ER 20 45 30.09.01 30/31.1.02  
2001-02 Bihta-Ara ER 19 44 28.12.01 30/31.1.02 Goods start 23.01.01
2001-02 Dildarnagar-Buxar ER 39 92 30.12.01 30/31.1.02  
2001-02 Buxar-Ara ER 66 143 01.02.02 30/31.1.02  
2002-03 Gaya-Jahanabad ER 43 49 30.03.03 26/27.05.03  
2002-03 Kusunda-Jamuniatand ER 23       Done by E.Rly
2002-03 Barasat-Hasnabad ER 52 60 10.12.02   Goods start 22.12.02
1964-65 Mughalsarai-Dagmagpur NR 34 88 25.3.65    
1965-66 Dagmagpur-Cheoki NR 104 243 6/17.4.65    
1965-66 Cheoki-Subedarganj NR 14 53 3/25.7.65    
1966-67 Subedarganj-Manoharganj NR 24 53 20.1.67    
1966-67 Manoharganj-Athsarai NR 34 74 24.1.67    
1966-67 Athsarai-Kanspur Gugauli NR 77 174 27.1.67    
1966-67 Kanspur Gugauli-Panki NR 64 191 3/6.2.67    
1966-67 Chandari Loops NR   2 30.3.67    
1968-69 Kanpur Panki (Priority lines) NR   12 27.9.68    
1968-69 Juhi Departure yard. NR   5 23.12.68    
1969-70 South Goods Receiving Lines, Up loop & Up shunting Neck of Panki Yard NR   4 20.11.69    
1970-71 Addition * NR 2 16  -   *Done by Rly.
1971-72 Panki-Phaphund NR 72 79 11/30.6.71    
1971-72 Phapund-Shikohabad NR 112 320 2/6.7.71    
1971-72 Shikohabad-Tundla NR 38 75 24.1.72    
1971-72 Tundla Yard NR   25 5/7.3.72    
1972-73 Tundla Yard NR   20 4.4.72    
1975-76 Tundla-Aligarh NR 78 430 01.8.75    
1975-76 Aligarh- Hardduaganj  NR 14        
1975-76 Aligarh- Khurja NR 43   31.12.75    
1975-76 Khurja- Ghaziabad NR 63   01.3.76    
1976-77 Ghaziabad-Sahibabad, New Delhi-Nizamuddin-Tughlakabad NR 32 143 3.8.76    
1976-77 Sahibabad-New Delhi-Delhi NR 17   7.1.77    
1982-83 Okhla-NDZ-New Delhi-Sakurbasti(DAL) NR 35 140 30.6.82    
1982-83 Tilakbridge-Faridabad (Jn. Cabin) NR 19 55 31.3.83    
1988-89 Tundla-Yamuna Bridge NR 18 20 31.3.89    
1991-92 Naya Azadpur-Rampura Cabin NR 9 9 3.30.92    
1992-93 Sabjimandi-Nayaazadpur NR 6 16 3.31.93    
1992-93 Khurja City-Khurja Jn. NR 3   3.31.93    
1993-94 Nayaazadpur-Sonipat NR 34 83 3.31.94    
1994-95 Sonipat-Panipat NR 47 203 Nov'94    
1994-95 Panipat-Karnal NR 35   Mar'95    
1995-96 Karnak-Kurukshetra NR 31   31.12.95    
1995-96 Kurukshetra-Shabadmarkanda NR 22   29.2.96 01.05.96 (KKD-UMB) & 17.7.96 (UMB-GVG)  
1995-96 Panipat-Khukrana and ASAN siding incl. NR 9   31.3.96    
1995-96 Shahbadmarkand-Mandigovindgarh NR 84   31.3.96    
1996-97 Mandigovindgarh-Ludhiana NR 56 155 31.03.97 19.02.97 up to Sanehwal & 18.6.97 upto LDH  
1996-97 Ambala-Jagadhari Workshops NR 43 97 31.03.97 25.9.98 Charged at 2.2 KV.
1997-98 Jagadhari Workshops -Saharanpur NR 36   Mar'98   Charged at 2.2 KV.
1998-99 Saharanpur Station NR 2   Mar'99    
1998-99 Kanpur Bridge-Unnao NR 14 40 Mar'99 17.4.00  
1998-99 Ambala-Chandigarh NR 42   Mar'99   Charged at 2.2 KV.
1998-99 Sirhind-Morinda NR 24   Mar'99 24.04.01  
1999-00 Saharanpur-KJGY Yard NR 8   Mar'2000 16.11.00  
1999-00 Kanpur- Kanpur Bridge NR 4 6 Mar'2000 17.4.00  
1999-00 Unnao-Lucknow NR 56 115 Mar'2000 17.04.00  
1999-00 Chandigarh-Kalka NR 25   14.8.99    
1999-00 Morinda-Ropar NR 27   04.2.2000 24.04.01  
1999-00 RTP siding NR 10   Mar'2000 24.04.01  
2000-01 Roopnagar-Nangaldam NR 53 79 27.2.2001 24.04.01 Goods start 27.02.01
2000-01 Nangaldam-Una NR 16   Mar'2000 24.04.01  
2002-03 Malhaur-Safedabad NR 9 21 21.6.02 24.06.02 Loco trial on 22.6.02
2002-03 Safedabad-Barabanki NR 7 14 29.09.02 01.10.02 Loco trial on 29.9.02
2002-03 Barabaki Yard NR 2 10 29.03.03    
2002-03 Ludhiana-Phillaur NR 14 33 02.12.02 29.10.03 Loco trial on 03.12.02. Goods start 21.02.03
2002.03 Phillaur-Phagwara NR 22 52 21.02.03 29.10.03 Goods start 21.02.03.
2003-04 Phagwara (excl.) - Jallandhar City (incl.) NR 22 73 12.08.03 29.10.03  
2003-04 Jallandhar City (excl.) - Amritsar (incl.) NR 79 233 20/21.01.04 23.01.04  
2003-04 Saharanpur-Roorkee (excl.) NR 31 72 30.03.2004    
2003-04 Tapri bypass line - Hindol Cabin NR 2 4  30.03.2004.    
2003-04 LKO Passenger Lines NR 4 15 31.03.2004    
2001-02 Lucknow Circular Rly NR/NER 35 61 30.3.02 19/20.4.02 Loco trial on 17.4.02
1979-80 Vijayawada-Chirala SCR 89 247 15.3.80    
1980-81 Ongole-Ulavapadu SCR 37 73 11.8.80    
1980-81 Ulavapadu-Bitragunta SCR 44 127 17.8.80    
1980-81 Bitragunta-Padugupadu SCR 30 64 12.10.80    
1980-81 Padugupadu-Gudur SCR 43 84 28.11.80    
1980-81 Chirala-Ongole SCR 50 113 22.5.80    
1981-82 Reception lines & Hump Lines at Vijayawada Yard SCR   16 13.1.82    
1983-84 Gudur-Venkatagiri SCR 38 46 31.3.84    
1984-85 Venkatagiri-Renigunta SCR 46 52 30.4.84    
1984-85 Renigunta-Tirupati SCR 9 30 1.11.84    
1985-86 Vijayawada-Rayanapadu SCR 10 124 22.3.86    
1985-86 Rayanapadu-Madhira SCR 39   31.3.86    
1986-87 Madhira-Dornakal SCR 72 171 22.12.86    
1987-88 Krishnacanal-Guntur SCR 26 28 31.3.88    
1987-88 Vijayawada Yard SCR   58      
1987-88 Dornakal-Warangal SCR 85 189 27.9.87    
1987-88 Warangal-Kazipet SCR 10 28 29.11.87    
1987-88 Kazipet-Ramagundam SCR 93 235 30.3.88    
1987-88   SCR          
1988-89 Guntur-Tenali SCR 26 28 28.2.89    
1988-89 Ramagundam-Bellampalli SCR 33 75 31.9.88    
1988-89 Bellampalli-Sirpur Town SCR 54 122 31.12.88    
1988-89 Sirpur Town-Wirpur SCR 26 61 8.2.89    
1988-89 Wirpur-Ballarshah SCR 31 66 30.3.89    
1991-92 Guntur-Nellapadu SCR 5 12 1/31/1992    
1991-92 Kazipet-Pindial SCR 3 6 12/30/1991    
1991-92 Pindial-Ghanpur SCR 15 36 1/30/1992    
1991-92 Ghanpur-Jangaon SCR 29 58 3/18/1992    
1991-92 Jangaon-Bebinanagar SCR 52 120 3/30/1992    
1992-93 Bibinagar-Maulali SCR 28 72 2/24/1993    
1992-93 Maulaali-Sanatnagar Bypass SCR 23 26 3/18/1993    
1992-93 Maulaali-Secundrabad(incl.) SCR 7 23 3/31/1993    
1993-94 Hussain Sagar-Hydrabad SCR 6 26 6/22/1993    
1993-94 Hussain Sagar-Sanatnagar SCR 5 16 12/10/1993    
1994-95 Motumari-Jaggayyapet SCR 27 33 Jan'95    
1994-95 Vijaywada bypass line-Mustabad SCR 13        
1995-96 Mustabada-Gannavaram SCR 5   30.11.95 30.04.96  
1995-96 Gannvaram-Nuzvid SCR 33   31.1.96    
1995-96 Nuzvid-Bhimadolu SCR 28   31.3.96    
1995-96 Kakinada-Samlkot-Rajahmundary SCR 69   31.3.96 19.11.96  
1995-96 Vishakhapatnam-Anakapalli SCR 27   31.3.96 12.2.97  
1995-96 Manikgarh-Gadchandur & Dornakal -Singareni SCR 59 69 31.3.96    
1996-97 Bhimadolu-Nidadavolu SCR 49 129 31.10.96 19.11.96  
1996-97 Nidadavolu-Rajahmundary; Kovyuru-3rd Godavari Bridge-Godavari (incl.); Samalkot-Annavaram SCR 61 149 19.11.96    
1996-97 Anakapalli-Annavaram SCR 79 228 12.03.97 24.3.97  
1960-61 Rajkharsawan-Dangoaposi SER 75 169 11.8.60    
1961-62 Damodar-Kalipahari SER 9 11 8.6.61    
1961-62 Adityapur-Tatanagar SER 2 2 22.7.61    
1961-62 Chakradharpur-Manoharpur SER 61 135 3.2.62    
1961-62 Manoharpur-Rourkela SER 41 85 12.2.62    
1961-62 Asansol-Purulia SER 74 170 8.6.61    
1961-62 Purulia-Chakradharpur, Kandra-Gomharria, Sini- Adityapur SER 156 360 4.7.61    
1962-63 Tatanagar-Kharagpur SER 128 165 4.1.63    
1962-63 Extra Heads, Yards etc.  SER   42 62/63    
1963-64 Anara yard SER   10 7.10.63    
1963-64 Damodar-Radhanagar SER 9 15 5.6.63    
1963-64 Ramkanali-Chaurasi SER 7 10 12.6.63    
1963-64 Adra Triangle SER 10 13 1.7.63    
1964-65 Rourkela-Birmitrapur SER 25 36 6.5.64    
1964-65 Nimpura Through Yard SER   16 28.2.65    
1965-66 Dangoaposi-Noamundi SER 8 19 2.2.65    
1965-66 Anara-Rukni-Santaldih-Washery SER 23 44 7/25.5.65    
1965-66 Santaldih-Pathardih-Sudamdih-Jamadoba SER 19 46 12/26.7.65    
1965-66 Joychandipahar-Sanka-Adra SER 18 19 14/21.8.65    
1965-66 Kalaikundah-Surdia SER   15 23.3.66    
1966-67 Padapahar-Deojhar SER 17 19 11.6.66    
1966-67 Deojhar-Banspani SER 12 13 14.7.66    
1966-67 Noamundi-Barajamda SER 14 33 14.10.66    
1966-67 Barajamda-Bolanikhadan SER 16 24 2.12.66    
1966-67 Barajamda-Gua SER 9 11 27.12.66    
1966-67 Surdiah-Jhargram SER   14 14.4.66    
1966-67 Jhargram-Gidni SER   15 27.4.66    
1966-67 Gidni-Chakulia SER   14 14.5.66    
1966-67 Salgajhari-Rakhamines SER   22 9/27.6.66    
1966-67 Rakhamines-Ghatsila SER   13 6/21.7.66    
1966-67 Asanboni Yard SER   1 30.7.66    
1966-67 Rakhamines & Galudih Yard SER   2 17.8.66    
1966-67 Ghatsila-Dalbhumgarh incl Dalbhumgarh Yard SER   12 31.8.66    
1966-67 Dalbhumgarh-Kokpara SER   9 1.9.66    
1966-67 Ghatshila Yard SER   1 21.9.66    
1966-67 Nimpura reception yard SER   15 31.12.66    
1966-67 Nimpura marshalling yard SER   4 23.2.67    
1967-68 Howrah platforms 9&10 SER   5 30.9.67    
1967-68 Kharagpur yard SER   8 4.10.67    
1967-68 Takiapara Flyover & avoiding Lines SER 9 46 12.2.68    
1967-68 Maurigram-Bauria SER 16 61 22.2.68    
1967-68 Nimpura Yard SER   9.5 1.6.67    
1967-68 Nimpura Yard SER   15.5 31.7.67    
1968-69 Bauria-Punchkura SER 47 159 13.4.68    
1968-69 Punchkura-Shyamchak SER 22 46 29.5.68    
1968-69 Shyamchak-Kharagpur SER 22 66 3.6.68    
1968-69 Santragachi-Padmapukur SER   8 27.6.68    
1968-69 Kharagpur Goods Yard SER   8 4.7.68    
1968-69 Santragachi-Washing Lines SER   2 19.7.68    
1968-69 Deulti-Macheda-III lines SER   6 25.7.68    
1968-69 Santragachi Departure Yard SER   3 30.8.68    
1968-69 Santragachi Loco Shed lines SER     27.1.69    
1968-69 Andul-Santragachi Dn Line SER   1 3.3.69    
1968-69 Addition * SER   27  -   *Done by Rly
1969-70 Bondamunda yard- Phase-I SER   8 6.4.69    
1969-70 Raurkela-Jharsuguda FP SER 107 241 6.4.69    
1969-70 Bondamunda Phase-II SER   12 10.6.69    
1969-70 Jharsuguda FP- Raigarh SER 67 159 19.1.70    
1969-70 Raigarh-Bilaspur SER 130 281 24.1.70    
1969-70 Bilaspur Yard SER 6 49 31.1.70    
1969-70 Addition * SER 3 8     *Done by Rly.
1970-71 Stage-I-Bilaspur(Excl)-Bia FP SER 131 340 2/10.9.70    
1970-71 Stage-IIA-Bhilai FP-Durg SER 13 24 27.9.70    
1970-71 Addition * SER 3 8  -   *Done by Rly.
1971-72 Andul-Dankuni SER 25 39      
1973-74 ?? SER   9 8.73    
1974-75 Panskura-Durgachak SER 59 77 11.12.75    
1975-76 Durgachak-Haldia SER 10 37 31.7.75    
1975-76 Departmental SER   5 10.75 to02.76    
1976-77 ?? SER 8        
1977-78 ?? SER   7 9.77 to 12.77   *Done by Rly
1978-79 ?? SER 3 6 11.78 to 3.79   *Done by Rly
1979-80 ?? SER   1     *Done by Rly
1980-81 Jagdalpur-Kirandul SER 150 216 31.8.80    
1981-82 Jagdalpur-Koraput SER 106 115 6.11.81    
1981-82 Addition* SER   3     *Done by Rly
1982-83 Koraput-Araku SER 215 309 26.12.82    
1982-83 Araku-Waltair SER          
1984-85 Santragachi-Bankaranayabaj (Up and Down chord line via ACC link) and Domjur-Bargachia section of Howrah-Amta SER 22 26 22.4.84    
1984-85 Kharagpur-Midnapur SER 14 15 5.6.84    
1985-86 Bhojudih-Mahuda SER 20 25 25.2.86    
1985-86 Mahuda-Gomoh SER 22 37 31.3.86    
1985-86 Abada station to new goods terminal yard SER   4 25.3.86   Departmental
1986-87 Chandrapura-Jamuniatand SER 2 2      
1986-87 Rajabera-Tupkadih SER 1 1      
1986-87 Tupkadih-BKSC SER 12 34 28.3.87    
1986-87 Jamuniatand-Mahuda SER 13 14      
1987-88 Champa-Korba SER 38 48 22.1.88    
1987-88 Tupkadih-Talgaria SER 33 34 25.3.88    
1988-89 BKSC Yard SER   3 10.8.88    
1988-89 Korba-Gevra Road SER 7 11 6.12.88    
1988-89 Koraput-Damnjodi SER 20 22 30.3.89    
1989-90 Durg-Paniajob SER 71 162 31.3.90    
1990-91 Paniajob-Gondia SER 66 151 1/22/1991    
1990-91 Gondia-Bhandara Road SER 64 147 3/31/1991    
1991-92 Bhandara Raod-Tharsa SER 25 67 11/30/1991    
1991-92 Tharsa-Nagpur SER 39 118 12/28/1991    
1992-93 Anuppur-Sahdol (excl.) SER 40 84 3/31/1993    
1992-93 Bilaspur-Khongsara SER 66 76 3/31/1993    
1992-93 Khodri-Venketnagar (incl.) SER 30 48 3/31/1993    
1992-93 Anuppur-Bijuri (incl.) SER 47 94 3/31/1993    
1992-93 Boridanad-Baikunthpur Road SER 42 55 3/31/1993    
1993-94 Shahdol-Chandiyl Road SER 87 201 3/26/1994    
1993-94 Anuppur Station SER 3 15      
1993-94 Khongsara-Khodri SER 20 43 3/30/1994    
1993-94 Venkatnagar-Anuppur SER 27 36 3/30/1994    
1993-94 Bijuri-Baridand-Manendragarh SER 15 34 2/13/1994    
1993-94 Baikunthpur-Bishrampur SER 58 82 3/3/1994    
1993-94 Daritola-Tigerhill SER 9 11 3/17/1994    
1994-95 Chandia Road - New Katni SER 33 93 Mar'95    
1994-95 Manendragarh-Chirimiri SER 25 46 Mar'95    
1994-95 Durg-Muranda incl. P.P yard SER 16 17 Mar'95    
1995-96 Dumetra-Lathikata SER 3 5 31.3.96    
1995-96 Mohuda-Karkend SER 14 20 31.3.96    
1995-96 Simachalam (North) -Gopalpatnam SER 12   31.3.96    
1996-97 Bondamunda-Lathikata SER 14 28 31.03.97    
1996-97 Lathikata-Chandiposh SER 14 18 31.03.97   Charged at 2.2 KV.
1996-97 Chandil-Gondabihar SER 9 13 31.03.97    
1996-97 Gondabihar-Tiruldih SER 24 27 31.03.97   Charged at 2.2 KV.
1996-97 Barkakana-Ramgarh Halt SER 4 4 31.03.97    
1996-97 Bhaga-Karkend SER 8 13 31.05.96 13.05.97  
1997-98 BKSC-Radhagaon SER 4   Mar'98 15/16.5.01 Charged at 2.2 KV.
1997-98 Chandiposh-Bimlagarh SER 16   Jan'98 06.07.01  
1997-98 Bimlagarh-Barsuan SER 21   Feb'98   Charged at 2.2 KV.
1997-98 Bimlagarh-Rangra SER 21   Mar'98    
1997-98 Tiruldih-Ramgarh SER 89     15/16.5.01  
1997-98 Simachalam-Kottavalasa SER 18.5   18.12.97 23.12.97  
1997-98 Duvvada-Vadlipudi SER 3.5        
1997-98 Adra-Bankura SER 54   Mar'98 23.9.98  
1997-98 Bankura-Bheduasol SER 6   Mar'98 23.05.00 Charged at 2.2 KV.
1997-98 Kottavalasa-Alamanda SER 21   Mar'98   Charged at 2.2 KV.
1998-99 Radhagaon-Muri SER 50   Mar'99 15/16.5.01  
1998-99 ?? (BKSC link line) SER     Mar'99    
1998-99 Muri-Kita SER 14   Mar'99 28.09.01 Charged at 2.2 KV.
1998-99 Rangra-Kiriburu SER 20   Jan'99 20.09.02 Charged at 2.2 KV.
1998-99 Linking line between Dumetra, Bangurkela & BNDM yard SER 8   Mar'99 20.09.02  
1998-99 Bheduasol-Chandrakona Rd SER 60   Mar'99 23.05.00  
1998-99 Chandrakona Rd-Salboni SER 5   Mar'99 23.05.00 Charged at 2.2 KV.
1998-99 Meramandoli-Talcher SER 16   Mar'99 10.09.03  
1998-99 Hijli-Bakhrabad SER 24   Mar'99    
1998-99 Bhadrak-Kenduapada SER 16   Mar'99    
1998-99 Palasa-Tilaru SER 48   Mar'99 28.4.00 Charged at 2.2 KV.
1998-99 Alamanda-Chiprupalli SER 44   15.12.98    
1998-99 Chiprupalli-Srikakulam Rd SER 38   Mar'99   Charged at 2.2 KV.
1998-99 Simachalam Reception & Despatch Yard SER 8   Mar'99    
1998-99 Purulia-Kotshila SER 36   Mar'99 15/16.5.00  
1999-00 Salboni-Midnapur SER 30   17.2.2000 23.5.00  
1999-00 Palasa Yard SER 4   21.1.2000 23.05.00  
1999-00 Palasa-Golanthra SER 63   Mar'2000 24.4.01 Good start Oct. '00
1999-00 Golanthra-Berhampur SER 9   Mar'2000 24.4.01 Charged at 2.2 KV. Good start 20.10.00.
1999-00 Srikakulam Road-Tilaru SER 20   15.11.99 28.4.00  
2000-01 Kita-Namkum SER 39 86 Mar'2001 28.09.01  
2000-01 Bandamunda-Orga SER 27 33 Mar'2001 20.09.02  
2000-01 Bakhrabad-Jaleswar SER 38 85 Mar'2001    
2000-01 Chatrapur-Rambha SER 25 231 20.2.2001 09.03.02  
2000-01 Rambha-Tapang SER 77   Mar'2001 09.03.02  
2000-01 Berhampur-Chatrapur SER 24 63 Mar'2001 24.4.01  
2001-02 Namkum-Ranchi-Hatia SER 20 55 28.09.01 28.09.01  
2001-02 Orga-Tati SER 15 18 28.2.02 20.09.02  
2001-02 Linking lines of Bondamunda 'P' 'B' & 'C' cabin SER 5 5 28.2.02 20.09.02  
2001-02 Hatia-Tati SER 111 135 31.3.02 20.09.02 Test charged
2001-02 Jaleswar-Amarda Road SER 16 38 15.08.01    
2001-02 Bhubaneswar Yard SER 3 15 08.02.02 9.03.02  
2001-02 Tapang-Khurda Road(Excl) SER 21 50 30.11.01 9.03.02  
2001-02 Khurda Road Yard SER 4 33 13.12.01 9.03.02  
2001-02 Khurda Road-BBS(excl) SER 15 35 08.02.02 9.03.02  
2002-03 BBS(excl)-Barang inclding Barang Yard SER 15 42 20.7.02 10.09.03 Loco trial on 21.7.02
2002-03 Rajatgarh-Barang SER 27 42   10.09.03 Goods start 04.09.02
2002-03 Rajatgarh-Sadashivpur SER 31 70 31.10.02 10.09.03 Loco trial on 10.02.03
2002-03 Sadshivpur-Meramandoli SER 23 50 30.01.03 10.09.03 Loco trial on 10.02.03
2002-03 Amarda Road- Balasore SER 37 92 31.03.2003    
2003-04 Talcher Station Yard SER 2 14 16.06.03 10.09.03  
2003-04 Barang(Excl)-CTC(Ex) SER 10 11 12.11.03    
2003-04 Rajatgarh (excl.) - Kapilas Road (excl.) / Nerigundi (excl.) & Radhakishorpur (excl.) - Machapur (excl.) SER 27 60  23.03.2004.    
2003-04 Balasore (excl.) - Ranital (excl.) SER 50 112  31.03.2004    
1931 Madras Beach - Tambaram SR 29 70 1931   Converted to 25 KV AC on 15.01.67
1964-65 Tambaram-Chengalpattu SR 134 212 9.1.65    
1964-65 Chengalpattu-Achrapakkam SR     31.1.65    
1964-65 Chengalpattu yard SR     21.1.65    
1964-65 Chennai-Tambaram (third line)* SR     15.1.65   *Energised at 1500 V DC
1964-65 Acharapakkam-Vikravandi SR     20.3.65    
1964-65 Vikravandi-Villupuram SR     26.3.65    
1964-65 Tambaram-Vandalur SR     1.62    
1967-68 ?? SR 3 5     Additions and alterations by Rly.
1971-72 Addition* SR   7     *Done by Rly
1979-80 Chennai-Gummidipundi SR 52 136 13.4.79    
1979-80 Basin Bridge- Chennai Beach SR 4 8 9.8.79    
1979-80 Basin Bridge - Stabling & Inspection Lines SR 2 2 24.12.79    
1979-80 Chennai Central Platform Lines 1 to 7 SR   7 29.12.79    
1979-80 Chennai-Trivellur SR 42 95 29.11.79    
1979-80 EMU Car shed Lines at Avadi SR   5 1.2.80    
1980-81 Elavur-Gudur SR 86 227 26.12.80    
1982-83 Arakkonam-Chitteri SR 9 18 30.3.83    
1982-83 Trivallur-Arakkonam SR 28 60 28.8.82    
1983-84 Arakkonam-Tiruttani SR 13 43 28.10.83    
1983-84 Chitteri-Walajah Road (excl) SR 27 61 29.3.84    
1984-85 Tirutani-Renigunta SR 53 147 25.12.84    
1984-85 Walajah Road-Katpadi SR 26 66 31.7.84    
1985-86 Katpadi-Kavanur SR 19 41 30.8.85    
1985-86 Kavanur-Gudiyattam SR 7 17 20.11.85    
1985-86 Gudiyattam-Jolarpettai SR 61 175 29.3.86    
1985-86 Additional Line between Basin bridge and Veysarpadi SR   4 31.12.85   Departmental
1985-86 Doubling of track between Veysarpadi and Korukkupet SR   2 27.2.86    
1986-87 Villivakkam-Avadi SR   24 2.10.86    
1987-88 Rayapuram-Korukkupet SR 2 4 26.9.87    
1989-90 Jolarpettai-Tirupattur SR 4 11 26.1.90    
1989-90 Tirupattur-Morapur SR 47 104 31.3.90    
1989-90 New second line between Singaperumal Koil-Guduvancheri SR   11 20.10.89    
1989-90 Lines connecting Road A & New B line at Tambaram SR   1      
1990-91 Jollarpettai-Mulanur SR 26 69 3/31/1991    
1990-91 Morappur-Salem (excl.) SR 61 142 3/31/1991    
1990-91 Singaperumal Koil SR 0 6 6/20/1990    
1990-91 Magnesite-Mettur dam SR 37 45 3/31/1991    
1991-92 Salem-Erode. SR 68 181 3/28/1992    
1991-92 Mulanur-Kuppam SR 8 17 10/10/1991    
1991-92 Kuppam yard SR 4 10 12/21/1991    
1991-92 Kuppam-Bangarpet SR 35 45 1/7/1992    
1991-92 Bangarapet-Whitefield SR 47 59 3/23/1992    
1991-92 Whitefield-Bangalor City SR 23 49 3/29/1992    
1992-93 Patabiram-Trivalur SR   13 3/31/1993    
1993-94 Bangalore-Nayandahalli SR 5   3/29/1994    
1993-94 Nayandahalli-Kengeri SR 8   3/30/1994    
1995-96 Erode-Tripur SR 50 114 31.1.96    
1995-96 Tripur-Coimbatore SR 50 132 31.3.96 06.06.96  
1995-96 Irugur-Walayar, Coimbatore-Podanur SR 32   31.3.96    
1996-97 Walyar-Palghat SR 31 87 04.11.96 16.11.96  
1996-97 Palghat-Vallatolnagar SR 50 99 30.03.97    
1996-97 Palghat - Palghat Town SR 4   25.03.97 05.06.97  
1997-98 Vallatolnagar-Punkunnam SR 21   Mar'98 22.9.98 Charged at 2.2 KV.
1997-98 Salem-Salem Market SR 4   Mar'98 21.5.98  
1998-99 Punkunnam-Chovvara SR 56   Mar'99    
1999-00 Chovvara-Ernakulam Jn. SR 35   Mar'2000 10.5.00 Goods start 02.08.03
2000-01 Tambaram-Chegalpattu SR 30 35 29.3.2001 11/12.12.01  
2001-02 Chengalpattu-Kanchipuram SR 35 40 30.10.01 11/12.12.01  
2001-02 Chengalpattu-Melmaruvathur SR 35 36 23.2.02 14.01.03 Loco trial on 18.4.02
2001-02 Melmaruvathur-Tindivanam SR 31 37 29.3.2002 14.01.03 Test charged
2002-03 Kanchipuram-New Kanchipuram SR 1 1 29.10.02 07.11.02  
2002-03 Tindivanam-Villupuram SR 37 53 19.12.02 14.01.03 Loco trial on 25.12.02
2002-03 Ernakulam (excl.) - Kurruppantara (excl.) SR 35 43 30.03    
2002-03 Renigunta (excl.) - Ballapalle (excl.) SR 22 51 29.03.03    
2003-04 Kurupantara (incl.) -Changanacheri (excl.) SR 37 37 31.03.2004    
2003-04 Ernakulam (excl.) - Shertalai (excl.) SR 30 30 31.03.2004    
2003-04 Ballapalle (incl.) - Nandalur (incl.) SR 64 77 31.03.2004    
2003-04 Kanchipuram-Takkolam SR 21 22  26.03.2004    
1928 Churchgate-Borivli * WR 36 202 Jan'28    
1936 Borivli-Virar WR 24   1936    
1972-73 Ahemdabad-Baroda WR 102 303 25.3.73    
1973-74 Baroda-Makarpura WR 9 20 23.5.73    
1973-74 Makarpura-Miyagam WR 21 48 10.11.73    
1973-74 Miyagam-Baroach WR 40 90 11.1.74    
1973-74 Baroda passenger Yard WR   10 23.5.73    
1973-74 Baroch-Bhestan WR 65 145 12.3.74    
1974-75 Bulsar-Atul WR 9   29.4.74    
1974-75 Atul-Vangaon WR 90 281 1.10.74    
1974-75 Vangaon-Virar WR 47   28.12.74    
1974-75 Bhestan-Bulsar WR 60 157 15.4.74    
1975-76 ?? WR   6     1500V DC
1976-77 ?? WR   17      
1981-82 Ahemdabad-Sabarmati WR 8 33 16.1.82    
1983-84 Anand-Thasra WR 38 59 1.10.83    
1983-84 Thasra-Godhra (excl.) WR 40 56 31.3.84    
1984-85 Godhra Yard WR 4 27 30.4.84    
1984-85 Vadodra-Godhra WR 70 155 30.3.85    
1985-86 Karchiya yard WR   15 3.6.85    
1985-86 Sevaliya - Wanakbori thermal power station siding WR   22 23.1.86    
1985-86 Godhra-Limkheda WR 36 81 29.6.85    
1985-86 Limkheda-Dahod WR 36 93 20.9.85    
1985-86 Dahod-Meghnagar WR 35 77 15.1.86    
1985-86 Meghnagar-Bamnia WR 34 76 29.3.86    
1985-86 Mathura-Bharatpur WR 31 66 17.3.86    
1985-86 Bharatpur-Bayana WR 42 103 30.3.86    
1985-86 Kasad station to yard of Karishak Barti Co-op Ltd (Hazira station) WR   29 15.2.86    
1986-87 Bamania-Ratlam WR 41 80 9.6.86    
1986-87 Ratlam Dn yard WR 2 12 15.7.86    
1986-87 Ratlam Up yard & bypass Yard WR 4 32 29.11.86    
1986-87 Bayana-Hindaun City WR 38 95 24.11.86    
1986-87 Hindaun City-Gangapur City WR 42 121 14.3.87    
1986-87 Gangapur City -Malarna WR 28 62 17.3.87    
1986-87 Malarna-Swaimadhopur WR 30 67 19.3.87    
1986-87 Swaimadhopur-Ghat-Ka-Varana WR 66 167 31.3.87    
1986-87 Ratlam-Khachod WR 21 57 20.1.87    
1986-87 Khachod-Nagda WR 15 26 22.3.87    
1986-87 Nagda FP-Vikramgad Alot WR 39 100 31.3.87    
1987-88 Vikramgarh A lot-Thuria WR 7 20 28.7.87    
1987-88 Thuria-Shamgarh WR 48 92 2.8.87    
1987-88 Shamgarh-Kurlasi WR 14 34 1.11.87    
1987-88 Kurlasi-Bhawanimandi WR 19 46 14.11.87    
1987-88 Bhawani Mandi-Ramganj Mandi WR 29 68 21.11.87    
1987-88 Ramganj  Mandi-Kanwalpura WR 13 33 12.12.87    
1987-88 Kanwalpura-Kota WR 55 129 24.12.87    
1987-88 Gurla-Kota WR 8 59 29.9.87    
1987-88 Ghat Ka Varana-Gurla WR 41 98 30.7.87    
1988-89 Thuria-Talavli WR   8 13.7.88    
1988-89 Bayana-Rupbas WR 32 34 31.3.89    
1989-90 Nagda-Piploda WR 11 28 7.2.90    
1989-90 Piploda-Palsora Makrawan WR 12 23 31.3.90    
1989-90 Rupbus-Fatehpur Sikri WR 16 23 31.1.90    
1989-90 Fatehpur Sikri-Yamuna Bridge WR 43 63 28.3.90    
1990-91 Palsora Makrawan-Naikheri WR 22 45 10/7/1990    
1990-91 Naikheri-Sipra Bridge WR 9 16 11/30/1990    
1990-91 Sipra Bridge-Ujjain WR 3 41 12/7/1990    
1990-91 Ujjain-Tajpur WR 14 29 2/7/1990    
1990-91 Tajpur-Maksi WR 24 51 3/15/1991    
1990-91 Maksi-Bolai WR 38 52 3/31/1991    
1990-91 Yamuna Bridge-Agra WR 5 7 3/27/1991    
1991-92 Bolai-Shujalpur WR 25 31 9/24/1991    
1991-92 Shujalpur-Kalapipal WR 12 19 2/14/1992    
1991-92 Kalapipal-Sehore WR 27 33 3/3/1992    
1991-92 Sehore-Bhopal WR 41 63 3/20/1992    
1992-93 Sabarmati (excl.)-Chandoliya WR 5 10 3/31/1993    
1992-93 Shujalur-Kalapipal WR   13 3/31/1993    
1993-94 Chandlodiya-Gandhinagar WR 23 30 3/31/1994    
1999-00 Udhna-Chalthan WR 11 13 Mar'2000 28-30.07.03 Goods start 02.08.03
2000-01 Chalthan-Vyara WR 44 51 Mar'2001 28-30.07.03 Goods start 02.08.03
2000-01 Jalgaon-Dharangaon WR 29 33 Mar'2001 28-30.07.03 Goods start 02.08.03
2001-02 Dharangaon-Amalner WR 24 29 31.10.01 28-30.07.03 Goods start 02.08.03
2001-02 Amalner-Nardana WR 32 43 16.3.02 28-30.07.03 Goods start 02.08.03
2001-02 Nardana-Dondaicha WR 36 40 31.3.02 28-30.07.03 Goods start 02.08.03
2002-03 Dondaicha-Nandurbar WR 27 31 31.7.02 28-30.07.03 Goods start 02.08.03
2002-03 Vyara-Ukaisongadh WR 17 20 31.10.02 28-30.07.03 Goods start 02.08.03
2002-03 Ukaisongarh-Lakkadkot (excl.) WR 6 12 31.03.03 28-30.07.03 Goods start 02.08.03
2002-03 Nandurbar (incl.) - Dhekwad (excl.) WR 5 16 31.03.03 28-30.07.03 Goods start 02.08.03
2003-04 Lakkadkot (incl.) - Bhadbhunja (incl.) WR 9 12  03.06.03. 28-30.07.03 Goods start 02.08.03
2003-04 Dhekwad (incl.) - Bhadwad (excl.) WR 13 15 29.06.03 28-30.07.03 Goods start 02.08.03
2003-04 Bhadwad (incl.) - Navapur (incl.) WR 45 52 19.07.03. 28-30.07.03 Goods start 02.08.03
2003-04 Bhadbhunja (excl.) - Navapur (excl.) WR 8 9  01.07.03. 28-30.07.03 Goods start 02.08.03
2003-04 Rajarappa line   0 18 31.03.2004    
  Total   16960        
Note: This site is not officially affiliated with Indian Railways! The official web site of Indian Railways is: http://www.indianrailways.gov.in
Site contact: webmaster@irfca.org
Copyright © 2010, IRFCA.org. About IRFCA  Contact Us  Search this site  Site Map  Links   Acknowledgements  Legal Information & Disclaimers